Nov 7, 2023 08:51
6 mos ago
34 viewers *
English term

duty cycle

English to French Medical Medical (general) Resuscitation
My sentence (describing a simulator): "Designed to facilitate a 50/50 duty cycle during chest compressions".

Je comprends le sens global de "duty cycle" (Duty cycle is the portion of time spent in compression relative to total time of the compression–decompression cycle), mais je bute sur un terme validé ou largement employé en réanimation pour le traduire. Merci d'avance !

Discussion

Johannes Gleim Nov 29, 2023:
IATE has 22 definitions with translations for 'duty cycle', all from different technical fields: https://iate.europa.eu/search/result/1701288394263/1
but none for medical, esp. no term like 'phase de compression', meaning 'compression phase', what has nothing to do with duty cycle. 'Duty cycle' desigates the duration of the ON part of the full period in precent.

A duty cycle or power cycle is the fraction of one period in which a signal or system is active.[1][2][3] Duty cycle is commonly expressed as a percentage or a ratio.
https://en.m.wikipedia.org/wiki/Duty_cycle

Rapport cyclique
pourcentage d'une période dans laquelle un signal est actif ou système
https://fr.m.wikipedia.org/wiki/Rapport_cyclique

Proposed translations

-1
1 hr
Selected

Phase de compression

Peer comment(s):

disagree Johannes Gleim : No relevant reference for duty cycle'. You've translated 'compression phase'
22 days
Something went wrong...
4 KudoZ points awarded for this answer. Comment: "Merci beaucoup à tous pour votre aide !"
27 mins

cycle de service

tradooit

In this resuscitation step, the oxidant flow rate can be temporarily increased by increasing a duty cycle of an air compressor by approximately 50% for a duration of between approximately 5 to 10 seconds.

http://brevets-patents.ic.gc.ca/opic-cipo/.../summary.html
Au stade de réanimation, on peut augmenter provisoirement le débit d'oxydant en augmentant un cycle de service d'un compresseur d'air d'environ 50 % pour une durée d'environ 5 à 10 secondes.

http://brevets-patents.ic.gc.ca/opic-cipo/.../summary.html
Source : Office de la propriété intellectuelle du Canada [ Voir le bitexte ]
Source : Office de la propriété intellectuelle du Canada [ Voir le bitexte ]
Peer comment(s):

disagree david henrion : non pertinent pour le sujet
45 mins
agree Johannes Gleim : Le plus fiable! User anywhere.
22 days
Something went wrong...
-1
1 hr

cycle de service

This term is commonly used in engineering and many other technical environments.
Peer comment(s):

disagree david henrion : non pertinent pour le sujet
7 mins
Something went wrong...
+2
1 hr

cycle de traitement

https://www.zoll.com/-/media/public-site/products/resqcpr/re...

see "Device description"


(50% duty cycle")

and then look at the French

--------------------------------------------------
Note added at 1 Stunde (2023-11-07 10:08:57 GMT)
--------------------------------------------------

also found this, but not in relation to CPR

Guide d'utilisation de l'oscilloscope numérique comme outil de ...
autotechnique.fr
https://www.autotechnique.fr › 2014/01 › 4.Osc...
Le rapport cyclique (Duty cycle), appelé également «coefficient d'utilisation» correspond au pourcentage (%) de temps à un circuit mis sous tension (ON) comparé ..
Peer comment(s):

agree david henrion : Effectivement, "rapport cyclique" pourrait convenir, surtout avec la définition donnée
1 hr
agree Johannes Gleim
22 days
Something went wrong...
+1
2 hrs

cycle de travail

À ma connaissance, il n'existe aucune traduction officielle du terme "duty cycle" en français. Il s'agit du ratio de compression thoracique.

La traduction que je propose est celle choisie par certains services préhospitaliers d'urgence au Québec. Au Canada on parle aussi de "taux de RCR", RCR désignant la réanimation cardiorespiratoire.
Example sentence:

Le ratio de compression thoracique le plus élevé possible durant tout le temps de la réanimation (duty cycle)

Peer comment(s):

agree Lionel-N
1 day 22 hrs
Something went wrong...

Reference comments

1 hr
Reference:

only finding

Duty Cycle/Capacity. Duty cycle: Maximum 6 actuations per hour. Capacity: Up to 20 actuations per fully charged Battery. Timer Feature. Elapsed time in seconds ..

--------------------------------------------------
Note added at 1 Stunde (2023-11-07 09:54:15 GMT)
--------------------------------------------------

Where did you find out that "duty cycle" =

Duty cycle is the portion of time spent in compression relative to total time of the compression–decompression cycle)?

--------------------------------------------------
Note added at 1 Stunde (2023-11-07 09:55:46 GMT)
--------------------------------------------------

please ignore the question
Something went wrong...
1 hr
Reference:

@Liz

Something went wrong...
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search